Create a New Pump by Importing a Smart P&ID Report into the Stockpile - Intergraph Smart P&ID - 11 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
11
Smart Engineering Manager Version
12
SmartSketch Version
11
  1. Open a drawing that includes a pump with an item tag, for example, P-100A.

  2. Run the Equipment List report. See Generate a Report for an Active Drawing.

  3. In the resulting report, change the value in the Item Tag cell by highlighting the last column in the report and the column right next to it, then selecting Format > Column > Unhide. The path name of the associated symbol is available in column T. Columns Y, Z, and AA display the Tag Prefix, Tag Sequence Number, and Tag Suffix properties, respectively.

  4. Select File > Save.

  5. Select File > Close.

  6. In Smart P&ID, select File > Import > Data file.

  7. Browse to the Equipment List report that you just created and modified.

  8. Select Open.

  • Importing new pipe runs using the Pipe Run List report is a little different because it also includes SP_ID and Fluid Code columns. The method above is valid, but you must be careful with row copy and paste because the layout is a little different. Additionally, you must clear the SP_ID value.

  • The delivered Item Tag format for pipe runs is unit code - tag sequence number - tag suffix - fluid code.