This scenario represents the following changes to the ABE data:

  • Stream Flow Rate property updated for both streams

  • Pump Capacity property updated for the ABE equipment source item

  • NumberRequired value increased from 2 to 3

These changes will result in the generation of the following To Do List tasks:

  • 2 Update tasks for existing pumps P-101A and P-101B

  • 2 Update tasks for pipe runs

  • 1 Create task for new pump P-101C

  1. Display the To Do List dialog for imported ABE data (equipment and streams):

  2. Select the 5 new tasks in the list (four Update tasks and one Create task) and select the Run PPM All Outputs Graphic command.

  3. From the EDE item list, select Equipment: Mechanical.

    The new pump assembly P-101C appears in the Active Drawing Stockpile.

  4. Select P-101C in the EDE and drag it to the Design Window to the position where you want to place it.

  5. Click to place the assembly.

  6. Select the main item of each assembly to view its properties and note the changed value for Pump Capacity.

  7. Select each pipe run in turn to view its properties and note the changed value for Stream Flow Rate.