The following table shows information about the symbols for break labels. When you drag these symbols to a drawing they are connected below the leader line attaching them to the item to which they are related. The Above sub-folder contains the identical set of symbols except that when you drag those symbols to a duct run in a drawing they are connected above the leader line.
ICON |
SYMBOL FILE NAME |
LABEL TYPE |
PLACEMENT TYPE |
---|---|---|---|
Construction Responsibility.sym |
Attribute Break |
Two Point |
|
Construction Status.sym |
Attribute Break |
Two Point |
|
Duct Height-Width.sym |
Attribute Break |
Two Point |
|
Ducting Materials Class.sym |
Attribute Break |
Two Point |
|
End of Group.sym |
Attribute Break |
Two Point |
|
Max Design Press - Temp.sym |
Attribute Break |
Two Point |
|
Max Operating Press - Temp.sym |
Attribute Break |
Two Point |
|
Purpose.sym |
Attribute Break |
Two Point |
|
Shape.sym |
Attribute Break |
Two Point |
|
Supply Responsibility.sym |
Attribute Break |
Two Point |