In PDS 2D, you set the construction status by selecting the New, Future, or Existing buttons on the Construction Status control. When you place an item, the default construction status is New.

In Smart P&ID, you can set construction status before or after you place an item:

  • If you know the construction status before placing an item, select Tools > Options, and then set the status on the Placement tab. All items that are subsequently placed in the drawing are assigned this status.

  • If you have already placed an item, select the item in the drawing and change the status in the Properties window.