Edit position details - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Web Help (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1
  1. To edit the position details, click the specific Position hyperlink.

  2. Select the Use Incomplete Specifications check box to allow incomplete specifications in creating BOM positions.

    If you select the Use Incomplete Specs check box, then

    • Specifications that do not contain any specification items can be used in creating a BOM position.

    • All short codes and option codes defined in the Short Codes page can be used in creating a BOM position independent of the selected specification.

    • All sizes of the nominal size table defined in the Nominal Sizes page, which are assigned to the specification header geometrics of the selected specification, can be used in creating a BOM position.

    • Once a short code is entered, you are forced to enter the corresponding sizes.

  3. In the Position Details section, type the Quantity to specify the ident quantity for this position.

  4. Select the specific Issue Status from the list.

  5. Optionally, select the Unit, List Status and Plate Number.

  6. Select the Requisition check box to include the quantity of this Position into MTOs.

  7. Select the Reload check box to specify if the OMI should update the corresponding record.

  8. In the Position Values section, select the specific property group and do the needful.

    If the ZB_SPAS project default is set to No (default), all position properties are displayed. If it is set to Yes, only properties to which the user has access (controlled by the list view assigned to the user securities or role) are shown.