DBA Settings - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Web Help (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1

If you import documents into the software, the following DBA settings must be defined:

  • DOC_IMPORT_PATH - With this setting, you define the database server path for Document Import jobs.

  • DOC_TIMEOUT – With this setting, you define the time after which the software stops trying to upload a file.

  • DOC_UPLOAD_CMD_ARGV_TRACE – This DBA setting controls the extended tracing for input parameters. This feature can help to troubleshoot the upload process. If you set this parameter to Y, the additional trace file doc_upload_trace.log is created in the directory specified by the DBA setting DOC_UPLOAD_DEST on the application server. This log file will have the text of the called program with all input parameters.

  • DOC_UPLOAD_DEST - Destination for upload of document files in the web environment. This DBA setting defines the name of the directory into which an uploaded document or uploaded document import file is to be written on the application server.

  • RBS_DOC – Assign a particular rollback segment for the document import job.

  • VALIDATE_ATTACHMENT_URLS – This DBA setting defines the validation on filenames of attachments in the Documents and Attachments screen in Smart Materials Web. This validation would occur for document types of Physical, Link and Hyperlink. This setting has the valid values of Y or N.

  • ATTACHMENT_ALLOWED_URLS – This DBA setting defines the attachment whitelist by specifying the list of URLs or UNC paths which are allowed when attaching files. The URLs are validated irrespective of whether they are active or inactive when the DBA Setting VALIDATE_ATTACHMENT_URLS is set to Y.

For more information about DBA settings, see Smart Materials DBA Settings.