By Reverse Pick - Intergraph Smart Materials - 5.1 - Help - Hexagon

Intergraph Smart Materials MobileScan Help (5.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
MobileScan
Search by Category
Help
Smart Materials Mobile Scan Version
5.1
  1. Tap Initiate Issue and then select By Reverse Pick.

    Initiate Issue - Main Screen - 4.5

  2. Enter Description.

  3. (Optional) Select issue date.

    By default, the application displays current date, but, you can edit the date based on your requirement.

  4. Type the site code.

    Site Code is displayed only when Bin location is enabled.

  5. Type or select the warehouse.

    If Bin location is enabled, the application sorts the warehouses based on the site code.

  6. Type or select the location.

    If Bin location is enabled, the application sorts the locations based on the selected warehouse.

  7. Tap the scan option in the Barcode box to scan a barcode/QR Code/RFID/Bluetooth beacons. Alternatively, you can type the barcode.

  8. Type the Quantity and then tap Confirm.

    The MIR is created after you Confirm.

    In Initiate Issue and Issue, a barcode can be based on an ident, item shipment, tag number or can be a custom barcode.

    Initiate Issue by Revere Pick scan confimed - 5.0

  9. Tap Done.

    Once MIR by reverse pick is set to done, the MIR will not be available in MobileScan application. You must sign in to Smart Materials to view the MIR.

  10. In Smart Materials, navigate to C.20.22.01 MIR by BOM Commodity screen and search for the MIR that has been created.

    4.2.1 Initiate Issue by reverse pick test 54 main screen

  11. Select Populate List Nodes to put the line items on the MIR.

    4.2.1 Initiate Issue by Reverse Pick populate list nodes

  12. Select Load Scans to import the scans from MobileScan into the MIR.

    4.2.1 Initiate Issue by Reverse Pick Load Scans

  13. Select Set start node to select the line item from the node list and select OK.

    4.2.1 Initiate Issue by Reverse Pick Set start node

  14. The path will now be set for the line item. Complete the creation of the MIR by selecting Proposal, Pre Check, and finally Create MIR details to set the MIR data. Once all the data has been confirmed, Save the MIR and post it.

    4.2.1 Initiate Issue by Reverse Pick start node list set