Fabrication tracking - Intergraph Smart Materials - Version 5.0 SP1 (5.0.1) - Help - Hexagon PPM

Intergraph Smart Materials MobileScan Help (5.0 SP1)

Language
English
Product
Intergraph Smart Materials
Subproduct
MobileScan
Search by Category
Help
Smart Materials Mobile Scan Version
5.0

Fabrication involves creation of spools, pipelines, structures, and parts from various raw materials using engineering drawings. Each fabrication shop/station handles a process such as Cutting, Folding, Machining, Punching, Shearing, Stamping, Welding, or Painting. At the final fabrication stage, you get the finished product.

The Fab Track feature in MobileScan allows you:

  • to import data from the design phase/BOM

  • plan the different stages in fabrication

  • issue and transfer items

  • track progress of work.

You can define your own fabrication types. A fabrication type can include two or more processes. For example, Type 1 can include Cutting, Folding, and Welding. Where as Type 2 can include Cutting, Folding, Punching, Welding, and Painting. For more information on defining a fabrication type, see Smart Materials MSCM Help.

In MobileScan, fabrication includes the following stages:

  • Initiate fabrication tracking process in the Initiate Issue tile

  • Fab track spool transfer in the Transfer tile includes the following steps:

    1. scan the spool

    2. scan the station to transfer in or transfer out material between different stations

    3. create a Direct MRR or add to an existing PO/create a new PO.

To enable and work with fabrication tracking using MobileScan, you must do the following:

  • Assign MOBILE_FABTRACK privilege to the user.

  • In Smart Materials:

    • Use A.10.15 Item Types screen, create an item type TFM and select Default.

    • To enable posting of MIR, MRR, MTR, select Use for APIs in User Security for Projects screen in Smart Materials.

    • To create stations in the Attributes screen, use either Char or Date Time data type.

    • In the Fabrication Types screen, while sequencing stations, the last station that is added must be _OUT.

  • Set the project default ZC_FAB_OPT to one of the following values:

    • Direct MRR (Default) - Always create a Direct MRR.

    • PO - Always create a PO.

    • Select - Provides you the option of creating a Direct MRR or a PO.