Assigning Procedures - Intergraph Smart Materials - Version 10.2 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.2

On PDS 10.04 Spec-Type-Procedure Relations, you assign the procedures to be executed to specification types.

Enter the sequence for the procedure in the Seq field, and select the procedure from the LOV in the Procedure field. If the Run Procedures check box on the General Configuration tab of PDS 10.01 is selected, these procedures are automatically started at generation.

Only procedures of type PMC can be attached to specification types.