Customize the Finalize Quote Pre-Check - Intergraph Smart Materials - Version 2020 (10.0) - Installation & Upgrade - Hexagon

Intergraph Smart Materials Installation (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Installation & Upgrade
Smart Materials/Smart Reference Data Version
2020 (10.0)

Before a quote can be finalized or signed and submitted on the Bid Summary & Submit screen, either the Completed or the No Bid indicator of all line items must be selected. Additionally, the quote reference number must be filled in.

You can use the M_PCK_QUOTE_CUSTOM.CAN_SIGN_SUBMIT_BID CIP procedure to add your own pre-condition checks for finalizing or signing and submitting a quote. The CIP returns an indicator value and a message, and it enables or disables the button. The message is displayed when you open the Bid Summary & Submit screen.

The possible indicator return values are:

  • W – Warning. The Warning icon is displayed with the corresponding message, and the Finalize Quote or Sign and Submit button is disabled.

  • I – Information. The Information icon is displayed with the corresponding message, and the Finalize Quote or Sign and Submit button is enabled.

  • S – Submit. No message is displayed, and the Finalize Quote or Sign and Submit button is enabled.