ZP_COR_ISD - Intergraph Smart Materials - Version 10.2 - Installation & Upgrade - Hexagon

Intergraph Smart Materials Installation (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Installation & Upgrade
Smart Materials/Smart Reference Data Version
10.2

The project default controls if only issued change order requests (CORs) are available to subcontractors in the Portal. If ZP_COR_ISD is set to N (this is the default) and a COR is created on the SM.40.02 Change Order Requests screen, the COR is immediately visible in the Portal on the Subcontracts screen. If ZP_COR_ISD is set to Y, the COR must be issued to make it available for the subcontractor in the Portal.

  • Module(s) affected by this setting: SM4002, Smart Materials Portal

  • Default value: N

  • List of Values: N/Y