ZP_ISH_QTY - Intergraph Smart Materials - Version 10.1 - Installation & Upgrade - Hexagon

Intergraph Smart Materials Installation (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Installation & Upgrade
Smart Materials/Smart Reference Data Version
10.1

The setting of this project default influences the data display on P.70.72 Expediting Details.

If the project default has been set to NEW, the supplement fields for order and engineering requisition show the highest supplement and the quantity fields the values of these highest supplements. That is, in this case they will contain the same values for all item shipments of one order line item if multiple item shipments have been created.

If the project default has been set to KEEP or KWO0, the supplement fields contain that supplement with that an item shipment has been created for the first time. The quantity fields show the values related to this first supplement. If several requisition supplements are associated with the same order supplement, the highest supplement number is displayed and the quantities with respect to requisition line items are totaled up.

With respect to the display of requisition and order supplement numbers, this project default is also used for all following downstream screens such as P.70.74 Packages, PT.20.01 Traffic Tree, or C.40.01 Information by Commodity, and Smart Materials Portal.

  • Module(s) affected by this setting: C200901, C200904, C300302, C4001, P3002, P3004, P5007, P7072, P7074, PT2001, PT2021, PT3003, PT3004, OPI1001, Smart Materials Portal.

  • Default value: NEW

  • Available values: KEEP, KWO0, NEW