You can find a detailed description of how to set project defaults and the purpose and usage of each project default in Site Project Defaults (ZC).

Some of the project defaults must be set before you start using the Site module on a new project. Others are optional depending on the detailed workflow established by the project.

Project Default

Comment

ZC_BIN_LOC

This project default controls whether warehouse logic (Warehouses like C.10.03 and Locations like C.10.01) is used (ZC_BIN_LOC=WHTU, default), or whether bin location logic is used (ZC_BIN_LOC=BLOC).

ZC_MULT_WH

If the project default ZC_MULT_WH is set to Y, you can only work with those warehouses for which the Use for Issues option has been checked on the C.10.02 Warehouses screen.

ZC_OI_HIST

Set this parameter to Y if you want to see the overissue history of an ident on the C.20.26 Inventory History screen. If this parameter is set to N, the overissue history is not shown.

ZC_QTYTRAN

This project default is used for material transfer. If the value is set to N (default), the move quantity is populated with 0 (zero) as the default in the corresponding screens. If ZC_QTYTRAN is set to Y, the move quantity is populated with either the reserved or the on hand quantity (depending on the kind of material transfer).