Workflow Diagram - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

The following steps are usually required to issue a requisition that was created by an MTO job.

  1. Check the requisition header information.

  2. Check the material (requisition line item) quantities.

  3. Define additional engineering information that the supplier needs or must conform with.

  4. Define the delivery requirements.

  5. Approve the requisition.

  6. Release the requisition to procurement.