The following steps are usually required to issue a requisition that was created by an MTO job.
-
Check the requisition header information.
-
Check the material (requisition line item) quantities.
-
Define additional engineering information that the supplier needs or must conform with.
-
Define the delivery requirements.
-
Approve the requisition.
-
Release the requisition to procurement.