-
The CLOSED requisition status is set when:
c. The requisition is released to Procurement
-
How can you specify that MTO jobs automatically round up the calculated quantity to cover contingencies?
By means of disposition rules
-
What do you specify with BOM sets?
a. The scope of the BOM to be included in the MTO job
-
The requisitions to be created by an MTO job are predefined by
b. Requisition templates
-
How can you ensure that an MTO job ‘finds’ all material within the defined scope of BOM?
Assign a template with no material restriction to the last requisition node to collect the leftovers.