Quote Detail Other Costs - Intergraph Smart Materials - 10.2 - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
10.2

To maintain other costs for the quote detail, double-click in the Seq, Engineering Requisition, Suppl, Origin, Pos, Sub, Proc Seq, Ident Code, Commodity Code, Extended Price, Discounted Price, Gross Other Costs, Net Other Costs, Net Price, or OC Discount fields. Window 2 opens.

On the Others Costs tab, you can attach other costs to the selected quote detail.

Select the other cost name from the LOV in the Other Cost field. You can assign an account code to the other cost by selecting a value from the LOV in the Account Code field if the project default ZJ_USE_AC is set to N, which means you are not using the accounting module in Smart Materials.

Select the Eval Cost indicator to mark this other cost as an evaluation cost.

Select the Discountable indicator to mark this other cost as discountable. If a discount is assigned to the quote detail and this indicator is marked, this other cost is discounted. That is, the discount is also applied to this other cost. The cost value total of the discountable other cost remains unchanged. But you can see the results of the applied discount in the Other Costs field. This indicator can only be set after a discount has been assigned to the quote summary or the quote detail. If the discount has been defined on the quote detail level via the Discount % and Discount Amount fields, the discount base must be set to Discount %. If the discount base is Discount Amount and no discount has been defined on the quote summary level, the Discountable check box cannot be set. If an other cost represents a discount (negative value in the Other Cost % field), this indicator cannot be set.

Instead of entering a cost value, you can enter a percentage in the Other Costs % field. For example, the costs for the documentation delivered for a quote detail amount to 2% of the quote detail costs. Depending on the setting of project default ZP_OC_DP, the percentage will be applied to the discounted price (ZP_OC_DP set to Y, default) or to the extended price (ZP_OC_DP set to N) of a quote detail. When you are working with a percentage instead of a value, the Cost Value Per Unit field is cleared and the Cost Value Total field is automatically filled. The currency of the quote detail is copied over if necessary. If a percentage has been entered, these fields cannot be manually changed any longer. If you want to do so, you must reset the percentage to 0.

To apply a discount to the quote detail. you must enter a negative value as a percentage. Such a discount is applied to the extended price of a quote detail and to all other costs on the quote detail level that have been marked as being discountable.

  • Discounts can only be entered if the project default ZP_OC_DISC is set to Y (default). If this project default is set to N, negative values are not allowed as a percentage.

  • Discounts are not discountable.

Alternatively, discounts can be defined in the Discount % and Discount Amount fields on the Quote Details tab.

You can select the type of unit price from the dropdown list in the Unit Price Type field. By default, the unit price has no type. The following values are available:

  • Including

  • Excluding

  • No Quote

  • Not Required

This unit price type information is meant to be used for spare parts.

You can only select a different type if the Other Cost % and Cost Value Total fields are set to 0 (zero). Values in the Other Cost %, Cost Value Per Unit, and Cost Value Total fields can only be entered if this Unit Price Type field is empty.

In the Cost Value Per Unit field, you can enter a cost value for each unit of the quote detail. The cost value total is automatically calculated by multiplying the cost value per unit with the quoted quantity of the quote detail and is displayed in the Cost Value Total field.

The total value of the selected other cost can be entered in the Cost Value Total field. If the project default ZP_NEG_OC is set to N (default), you can only enter values greater than or equal to 0 (zero). If ZP_NEG_OC is set to Y, you can also enter negative values.

The currency of the cost value is shown in the Currency field. The default value of the currency is given by the value of the project default ZX_CURCY. You can double-click in this field to open the A.10.12 Units of Measure screen where currencies are defined.

The descriptions of the other cost appear in the Short Desc and Description fields.