Basic Requisition Setup - Intergraph Smart Materials - 10.2 - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
10.2

Purpose

This section explains how to do a basic requisition setup when starting a new project in the Smart Materials E&PI(Req) module.

Exercise

  1. Open the R.10.11 Req Status screen from the Smart Materials > E&PI (Req) > R.10 Setup menu branch. The screen opens in input mode; all fields are empty and the mandatory fields are displayed with a green background.

  2. To create the req status ‘OPEN’, enter ‘OPEN’ in the Status field and ‘Open’ in the Short Desc and Description fields. Select the Default indicator, and then click the Save button. Create a second status ‘CLOSED’ in the same way, but select the Production indicator. Click the Save button.

  3. Close the screen by selecting File > Close All or Close from the main menu.

  4. Open the R.10.13 Req Number Rules screen from the Smart Materials > E&PI (Req) > R.10 Setup menu branch. The screen opens in input mode; all fields are empty and the mandatory fields are displayed with a green background.

  5. To create the req rule ‘PIPING’, enter ‘PIPING’ in the REQ Rule field, ‘Piping’ in the Short Desc field, and ‘Number Rule for discipline Piping’ in the Description field. In the REQ Rule Definition field, click the List of Values button to open the LOV. Select MTO_TYPE from the list and click OK. Then enter the minus sign (-), open the LOV again, select REQ_TEMPLATE from the list, and click OK. To save the new rule, click the Save button.

  6. Close the screen by selecting File > Close All or Close from the main menu.

  7. Open the R.10.15 Req Desc Rules screen from the Smart Materials > E&PI (Req) > R.10 Setup menu branch. The screen opens in input mode; all fields are empty and the mandatory fields are displayed with a green background.

  8. To create the req description rule ‘PIPING’, enter ‘PIPING’ in the REQ Desc Rule field, ‘Piping’ in the Short Desc field, and ‘Description rule for discipline Piping’ in the Description field. In the REQ Description Rule Definition field, click the List of Values button to open the LOV. Select TEMPL-NLS-DESC from the list, and click OK. To save the new rule, click the Save button.

  9. Close the screen by selecting File > Close All or Close from the main menu.