BOM Sets - Intergraph Smart Materials - 10.2 - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
10.2

Purpose

This section explains how to define BOM sets when starting a new project in the Smart Materials E&PI(Req) module.

Exercise

  1. Open the R.10.31 BOM Setup Nodes screen from the Smart Materials > E&PI (Req) > R.10 Setup menu branch. The screen opens in input mode; all fields are empty and the mandatory fields are displayed with a green background.

  2. To create the new BOM set ā€˜PIPINGā€™, enter ā€˜PIPINGā€™ in the BOM Set field and ā€˜Pipingā€™ in the Short Desc and Description fields. To save the new set, click the Save button.

  3. Click in the List Node field of the second (BOM Setup Nodes) block.

  4. Click the List of Values button to open the BOM multi-selection LOV.

    If you want to select a lower level node, click the + sign in front of the node name to expand the node.

  5. Select the Sel check box of the top node PIPING

  6. Click the button to copy the selected node to R.10.31. This action automatically closes the multi-selection window, copies the selected nodes to R.10.31, and saves the changes.

    The BOM set definition should now look like the picture below.

  7. Close the screen by selecting File > Close All or Close from the main menu.