-
How would you set up a fixed BOM node hierarchy?
Set the project default ZB_BOMHIER to N and define the BOM hierarchy on B.10.07.
-
Where should the S/F (shop/field) information of a BOM position be stored?
b. Position attribute
-
You create a new BOM position using specification items. Which data must be entered?
Spec code, short code, option code, sizes
-
How can a BOM node be locked?
Using a verification job, set the list status that has the Lock indicator checked.
-
Which BOM position information is an indicator for the status or quality of the position?
List status