Inspections and tests - Intergraph Smart Materials - Version 10.2 - Help - Hexagon

Intergraph Smart Materials Classic Help

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.2

You can identify any inspections or tests required, such as equipment inspections, work-in-progress inspections, performance tests, and so forth.

Setup

Before entering inspections and tests, you must enter data for inspection and test items, test sets, and status. Go to the following screens:

  • SM.10.35 Inspection and Test Items

  • SM.10.36 Inspection and Test Sets

  • SM.10.37 Inspection Status

Enter an inspection or test

  1. In the menu tree, navigate to Smart Materials > Site > Subcontract Management > SM.30 Site Administration.

  2. Double-click SM.30.04 Inspection and Test Workload.

  3. Create a new record.

    The Seq field is automatically filled with the next available number.

  4. Select either Inspection or Test in the Type field.

  5. In the Inspection/Test Set field, use the LOV to select a set (from SM.10.36).

  6. In the Agreement field, use the LOV to pick an approved agreement.

  7. In the Inspection Status field, use the LOV to pick a status (from SM.10.37).

  8. Save the record.

  • After saving the record, you can double-click the Seq field to see a second window with Details and Checklists tabs. At the top of this window, you can click NCRs to open SM.30.07 Non Conformance Reports to see all existing NCRs assigned to the current agreement. If needed, you can create a new NCR.

  • To close the inspection or test, click Closed on the Details tab. After you click Save, the entire record is locked.

  • The Checklists tab displays all the inspection/test items from the specified inspection/test set. Only one of the check boxes (Pass, Fail, N/A, Hold) can be checked for each item.