B.20.01.08 Copy Structure - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Classic Help

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1
  1. Open B.20.01 Edit BOM.

  2. Select the BOM node under which an additional node structure is to be created. This is the destination node.

  3. Click Copy Structure .

    Screen B.20.01.08 Copy Structure opens.

  4. If you want to copy from the login project, select same Project/Product Group.

    Alternatively, select other Project, and select the project from which the node structure should be copied from the LOV in the Project/Product Group field.

  5. Click in the Node Name field, and click the Browse button. This opens another dialog box where the WBS of the selected project is shown.

  6. Select the node that should be copied, and close the dialog.

  7. Select only Structure if you want to copy only BOM nodes.

    Alternatively, select with Structure and Positions if you want to copy also the BOM positions.

  8. Select the keep Item Number check box if the item numbers of positions should be kept.

  9. Select the with Assemblies check box if you want to copy assemblies with the positions.

  10. Optionally, select the issue status if you want to copy positions into another issue status.

  11. Click Copy.

    The node is created and displayed in the tree on B.20.01.