Required Data in the Smart Materials Database - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Classic Help

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1

For the OMI interface to work, you must have already created a complete and working BOM setup. For more information about the BOM Administration screens, please consult the documentation for the Smart Materials BOM module. This BOM setup data consists of the following data items:

  1. There needs to be at least one applicable list status present (B.10.02).

  2. A default list status must have been defined as the project or project discipline default (A.20.12/A.20.13 screens). This default list status must be open; that is, it must allow deletion and overwriting of BOM positions, and it must have the Lock indicator unchecked.

  3. At least one issue status must have been defined (B.10.08).

  4. A default issue status must have been defined as the project/project discipline default (A.20.12/13).

  5. All required BOM node types and their associated variable node attributes must have been set up on the B.10.03screen.

  6. All required discipline-dependent variable BOM position attributes must have been set up on the B.10.04 screen.

  7. If applicable, the allowed BOM node type hierarchy must have been defined (B.10.07).

  8. The BOM position numbering scheme, consisting of the ZB_LPSTART and ZB_LP_INC parameters on the A.20.12/13 screens, must have been defined.

  9. You must have specified whether free or fixed BOM structures are in effect with the ZB_BOMHIER parameter on A.20.12/13.

  10. You must have specified whether any quantity other than 1 is allowed for tagged items or not with the ZB_TAGQTY parameter on A.20.12/13. This parameter is ignored for shape material.

  11. On the A.10.15 screen, a default item type with item rule SOT (Standard without tags) must be present.

  12. On the A.20.12/13 screen, a valid definition of the default Commodity Part for tagged items and shape tagged items must be present.

  13. You must decide how BOM position numbers will be built upon importing and configure the ZI_OMI_POS project default accordingly.

  14. Depending on how modifications to BOMs with quantities already reserved or even issued on-site should be handled by OMI, the ZI_OMI_TSQ project default needs to be configured accordingly.

  15. The ZX_BOM_UK1...ZX_BOM_UK4 parameters can be set additionally, if the TSQ logic is used. These parameters define BOM attributes that help to uniquely identify a BOM position in the mapping search phase of a Site Qty Transfer operation.

  16. If the "Transfer Site Qty" logic is used, the ZI_OMI_DCC and ZI_OMI_DCA parameters for the Design Change Control option must also be configured

Depending on the kind of data you want to import, other Smart Materials modules must also have been set up correctly. Among those data items that you should check are:

  1. All attributes that are to be used must be set up correctly on the A.50.01 screen.

  2. As far as units for BOM positions and variable attributes are concerned, you must have a working setup of unit systems (A.10.06), unit sets (A.10.07), units (A.10.12), and their conversion rules (A.10.13).

  3. If you intend to use the OMI company mapping feature, the company-specific translations for Smart Materials commodity codes (S.30.C.01) and idents (S.80.C.01) must have been set up.