A work package is a user-defined selection of BOM nodes and materials in which you can define specific Where conditions for the ident and list position selection (scope of material). You can define BOM work packages on the B.40.12 BOM Work Packages screen.

To create a new work package, enter the work package name in the Work Package field and the descriptions in the Short Desc and Description fields.

The next fields can be used to assign Where conditions to the selected work package. For more information see Where Conditions.

In the Where Condition for Ident field, you can select a pre-defined Where condition from the LOV. The LOV shows all Where conditions defined on A.60.06 for the ‘B4012_1’ module. Double-click in the field to open the A.60.06 screen. With this Where condition, you can limit the idents (material) to be selected from the BOM.

In the Where Condition for List Pos field, you can select a pre-defined Where condition from the LOV. The LOV shows all Where conditions defined on A.60.06 for the ‘B4012_2’ module. Double-click in the field to open the A.60.06 screen. With this Where condition, you can limit the WBS nodes and BOM list positions to be selected from the BOM.

Select an attribute from the LOV in the Attribute field. All attributes defined on A.50.01 are available for selection.

Next, select a value from the dropdown list in the Priority Type field. The available values are:

  • ATTRIBUTE

  • WORK PACKAGE

With the selection of the Locked indicator, you can lock a work package, which means that the assigned Where conditions, BOM paths, and so forth cannot be changed.

Only users with the UNLOCK WORK PACKAGES privilege granted are allowed to reset the Locked indicator of a work package.

Enter the user who is responsible for this work package in the Name field. By default, the logged in user is entered when creating a new work package.

In the second (Work Package Details) block, you assign BOM list nodes to the selected work package. To select the nodes in the WBS (Work Breakdown Structure), click the Nodes button on the right at the top of the second block. This will open the BOM multi selection LOV displayed below.

Select the Sel check boxes of the nodes to be added to the work package, and then click the Fill In button to close the LOV and to add the selected nodes to the work package. You can use the Select All button to select all displayed nodes in one step. To cancel a selection, click the Unselect All button.

The sequence number in the Seq field will be filled automatically. This sequence number defines the order in which the list positions will be processed. If necessary, adjust these sequence numbers manually. The sequence numbers must be unique within a work package.