Estimation - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)

The creation of blanket orders is normally done based on an estimation. Such an estimation is very often done on a very high level of the work breakdown structure (WBS). In this case, the estimation is created on the highest available node PIPING.