This project default specifies whether to check on posting a MIR revision, if all on-hand quantities of overissued material from last revision are available. If not enough overissue quantity is on-hand to revise the MIR, an appropriate message is displayed and the processing stops.
On revising a MIR, the complete overissue quantity from last revision must be onhand.
If this project default is set to N, the software does not check the available on-hand quantity on revising a MIR.
-
Module(s) affected by this setting: C.20.21, C.20.21.11, C.20.22, C.20.22.02, C.20.22.04 und C.20.29
-
Default value: Y
-
List of Values: N/Y