ZP_MS_CRT - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default specifies whether the software automatically creates planning items for requisitions and tagged items on requisitions or not.

If set to Y, this option will come into effect if you start an MTO job from R.20.01 or create a new engineering requisition manually on R.30.01. The software will then check for each requisition whether a matching planning item exists, and if not, create it. If you set the ZP_MS_CRT option to N, the software will only create links to existing planning items, but will not create new ones.

The project default is also used when setting or updating a milestone set on the R.30.01 Maintain Requisitions screen. Changing the milestone set calls the CIP m_pck_req_custom.ms_reference, which is also used by the MTO job (see above).

  • Module(s) affected by this setting: P3001, P3005, P6001, P6003, P6005, R2001, R3001

  • Default value: N

  • List of Values: N/Y