ZR_PO_SR - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default represents the SR revision scheme for purchase order requisitions.

The following are the validations to be followed in defining the scheme

  1. #N or #C to be part of the schemes,

  2. After #N there should be a number,

  3. After #C there should be a character and

  4. The length of the scheme not to exceed 10 characters

For example, P#N1 and E#CA... are valid schemes

  1. A term like P#N1 would generate a sequence P1, P2, P3 ... P99, P100...

  2. A term like E#CA would generate a sequence EA, EB, EC ... EZ, EZ1, EZ2...

  3. A term like #N1 would generate a sequence 1,2,3,4...

  4. A term like #CC would generate a sequence C, D, E, F ...Z, Z1, Z2...

  5. A term like #CAE would generate a sequence AE, BE, CE ... ZE, ZE1, ZE2 ...

  6. A term like #CABCD would generate a sequence ABCD, BBCD, CBCD...

  • Module(s) affected by this setting: R1041, R3001

  • Default value: ./.

  • List of Values: ./.