ZP_REFDATE - Intergraph Smart Materials - Version 10.2 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.2

This project default allows you to change the behavior of the Ref. Date field on the P.90.01 Load Fab Tracking screen.

If the project default is set to Y, this field is mandatory, and you must enter a value to save the job.

If the project default is set to N (which is the default value), the field is optional.

  • Module(s) affected by this setting: P9001

  • Default value: N

  • List of Values: N/Y