ZB_EST_LEV - Intergraph Smart Materials - Version 10.2 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.2

This project default specifies the level in the BOM hierarchy at which the estimation shortage is calculated and the Estimation Shortage node (indicated by ZB_EST_NOD) is created. This level usually represents the line level in the BOM hierarchy. All ISO nodes are found below this level.

  • Module(s) affected by this setting: B2003

  • Default value: ./.

  • List of Values: B1003/B1007 Node Type/Hierarchy