ZP_ALNOBID - Intergraph Smart Materials - Version 10.2 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.2

This project default controls if the No Bid check box can be set on P.30.22 Commercial Evaluation screen.

If ZP_ALNOBID is set to N (default), the No Bid check box can only be selected if the Bid Due Date, Revised Bid Due Date, or the bidder specific Bid Due Date has not yet expired.

If ZP_ALNOBID is set to Y, No Bid can be set although Bid Due Date and Revised Bid Due Date have already expired.

  • Module(s) affected by this setting: P3022

  • Default value: N

  • List of Values: N/Y