With this project default you control the sequence of attribute copy for item shipment line items during the OPI import.
If this project default is set to P, the PO line item attributes are copied first, then the item shipment line item attributes. If ZP_COPY_PR is set to S (this is the default), only item shipment attributes are copied.
-
Module(s) affected by this setting: OPI
-
Default value: S
-
List of Values: P, S