Many actions in Smart Materials trigger the dispatch of an email. The table below lists these triggering actions, the place in the application where they happen, and the actions which are triggered. Additionally, the email templates, CIPs, and project defaults are mentioned which are involved.

Triggering Action

Associated Screen/tab

eMail Template Type / CIP

Associated Project Default

Action

Administration

Request to create a new Smart Materials user

Click New User, type required data, and click Submit.

Logon

Email sent to super user with a new Smart Materials user request.

Request for Access Rights

Click Submit button.

A.20.06.21

Email sent to super user that a user is requesting additional rights.

Grant Access Rights.

Click Grant button.

A.20.06.21

Email sent to the user about additional rights that have been granted by the super user.

Approval reminder

Click Approval Reminder Job button on A.20.45 to create a job that checks outstanding approvals.

A.20.45

A.60.45

Email sent to approver who failed to approve.

Change User password

A.10.23

PSW/USR CHANGED

ZP_EMT_PWC

Password changed notification sent to user (If the contact has a default email address assigned)

Requisition

Approve requisition

R.30.01

REQUISITION APPROVAL/REJECTION

ZR_EMT_RA

Email sent to the originator on approval of the engineering requisition

Reject requisition

R.30.01

REQUISITION APPROVAL/REJECTION

ZR_EMT_RR

Email sent to the originator on rejection of the engineering requisition

Revert requisition approval

A.20.49
R.30.01

REQUISITION APPROVAL/REJECTION

ZR_EMT_RV

Email sent to the approver to whom the approval sequence of an engineering requisition was reverted

NDA

Approve NDA

P.20.01

M_PCK_NDA_CUSTOM.GET_NDA_APPROVED_MAIL

n/a

Email sent to supplier when supplier's NDA status is set to Approved or Approved with comments.

Reject NDA

P.20.01

M_PCK_NDA_CUSTOM.GET_NDA_REJECTED_MAIL

n/a

Email sent to supplier when supplier's NDA status is set to Rejected.

Specify NDA exemption

P.20.01

M_PCK_NDA_CUSTOM.GET_NDA_EX_SUPPLIER_MAIL

n/a

Email sent to supplier and ZP_NDA_ML distribution list when supplier's NDA status is set to Exemption.

Change NDA status

P.20.01

M_PCK_NDA_CUSTOM.GET_NDA_STATUS_CHANGE_MAIL

n/a

Email sent to supplier and to ZP_NDA_ML distribution list when supplier's NDA status is set back to Pending or Received.

Click Send Reminder button

P.20.01

Window 17

M_PCK_NDA_CUSTOM.GET_NDA_REMINDER_MAIL

n/a

Email sent to all project suppliers with Pending NDA status.

Buyer uploads NDA document

P.20.01

Window 17

M_PCK_NDA_CUSTOM.GET_NDA_BUYER_UPLOAD_MAILTOSUP

n/a

Email sent to all project suppliers with Pending NDA status.

Buyer uploads NDA document

P.20.01

Window 17

M_PCK_NDA_CUSTOM.GET_NDA_BUYER_UPLOAD_MAILTOBUY

n/a

Email sent to ZP_NDA_ML distribution list.

Supplier uploads and submits signed NDA document

Portal

NDA panel

M_PCK_NDA_CUSTOM.GET_NDA_SUP_UPLOAD_MAILTOBUY

n/a

Email sent to ZP_NDA_ML distribution list.

Inquiry is approved and NDA Exemption is selected on Inquiry tab

P.30.21

M_PCK_NDA_CUSTOM.GET_NDA_EX_INQUIRY_MAILTOSUP

n/a

Email sent to suppliers with NDA status that is not Approved or Exemption, and to ZP_NDA_ML distribution list.

Inquiry is approved and NDA Exemption is selected on Inquiry tab

P.30.21

M_PCK_NDA_CUSTOM.GET_NDA_EX_INQUIRY_MAILTOBUYER

n/a

Email sent to ZP_NDA_ML distribution list

Inquiry is approved and NDA Exemption is selected on Bidders tab

P.30.21

M_PCK_NDA_CUSTOM.GET_NDA_EX_BIDDER_MAIL

n/a

Email sent to suppliers with NDA status that is not Approved or Exemption and who have NDA Exemption selected on Bidders tab, and to ZP_NDA_ML distribution list.

Inquiry is approved

P.30.21

M_PCK_NDA_CUSTOM.GET_NDA_NON_EX_BIDDER_MAIL

n/a

Email sent to suppliers with NDA status that is not Approved or Exemption and who do not have NDA Exemption selected on Bidders tab, and to ZP_NDA_ML distribution list.

Inquiry

Reverse Bidder Approval

A.20.49
P.30.21
Bidders tab

P.30.21 >
Bidders tab > A.20.49 Approval Sequence

Email sent to buyer at reversing the bidder list approval

Inquiry ready for approval

Select Inquiry RfA check box

P.30.21
Inquiry tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_INV

Email sent to approver

Approve Inquiry

Click Approve button, or approval sequence finished (all Approved check boxes selected)

A.20.49
P.30.21

INQUIRY APPROVAL/REJECTION

M_PCK_EMAIL_CUSTOM.GET_CC_BCC

ZP_EMT_IA

Email sent to buyer at inquiry approval

Reject Inquiry

Select Rejected check box in approval sequence

A.20.49
P.30.21

INQUIRY APPROVAL/REJECTION

ZP_EMT_IR

Email sent to buyer at inquiry rejection

Reverse Inquiry Approval

Click Reverse Approval on the Inquiry tab, or on A.20.49 in case of approval sequence

A.20.49
P.30.21

Email sent to the buyer with the reason for reverse approval

Request for quotation

Click Approve button, or approval sequence finished (all Approved check boxes selected)

A.20.49
P.30.21

All types

ZP_EMT_RQS (Request for quotation supplement 0)

ZP_EMT_RQM (Request for quotation supplement >0) If ZP_EMT_RQM is not defined, the template assigned to ZP_EMT_RQS is used for all supplements.

ZP_EN_ACT

Request for Quotation email sent to bidders for which the RFQ Email indicator is set on P.20.01 and for which a communication link of type RFQ_EMAIL is defined on A.10.23 and filled with a valid email address.

If project default ZP_USECON is set to N, the email addresses will be taken from the Addresses tab. If ZP_USECON is set to Y, the email addresses will be taken from the Contacts tab. In that case, only bidders with entries in the Company Employee field on the Bidders tab of P.30.21 will get an email.

Invite potential bidders whose email addresses are entered on the Mailing List tab.

Approve inquiry

P.30.21
Mailing List tab
Inquiry tab

ZP_EMT_MIP

Email sent to potential bidders to register in Smart Materials Portal and to provide a bid

Inquiry addendum ready for approval.

Select Ready for Approval check box.

P.30.21 Addenda tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

->

M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_ADD

ZP_APRADD

Approval sequence filled

Email sent to the first approver on the approval sequence

Issue Inquiry Addendum

Click Issue button

P.30.21
Addenda tab

ADDENDUM ISSUE

ZP_EMT_AI

Email sent to bidders at Addendum Issue

Click Remind CCI button

P.30.22

Quote Summaries tab

M_PCK_QUOTE_CUSTOM.GET_CCI_REMINDERS_MAIL

Reminder email sent to the bidder to accept the CCI (Commercial Conditions and Instructions)

Click the Mail button

P.30.24

B2B

Email with attached Excel sheet sent to the bidder

Submit RFI answer to bidder

Select the Submit Answer check box

P.30.22
RFI/Clarifications tab

P.30.23 RFI/Clarifications tab

ZP_EMT_RAB

or

ZP_EMT_RA if ZP_EMT_RAB is not set

Email with the answer on an RFI question is sent to the bidder(s).

Submit RFI question to bidder

Select the Submit Question check box

P.30.22
RFI/Clarifications tab

P.30.23 RFI/Clarifications tab

ZP_EMT_RQB

or

ZP_EMT_RQ if ZP_EMT_RQB is not set

Set RFI Status to Closed

P.30.22 RFI/Clarifications tab

P.30.23 RFI/Clarifications tab

REQUEST FOR INFORMATION

ZP_EMT_RFC

Email notification sent to supplier

Set RFI Status to Open

P.30.22 RFI/Clarifications tab

P.30.23 RFI/Clarifications tab

REQUEST FOR INFORMATION

ZP_EMT_RFO

Email notification sent to supplier

Technical evaluation of an alternate or option is needed.

Click Send Mail button and type email address

P.30.22
Alternates/Options tab

ZP_EMT_TE

Email sent to the responsible user to notify him about the required technical evaluation

Quote summary ready for approval

Select the Quote RfA check box (if approval sequence is assigned to the quote summary)

P.30.22

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_QS

Email sent to the first user in the approval sequence

Approve quote summary

Click Approve button, or all approvers of the approval sequence have approved

A.20.49
P.30.22

Email sent to buyer

Reverse quote summary approval

Click Reverse button on P.30.22 or on A.20.49

A.20.49
P.30.22

Email sent to the approvers to inform about the reversal

Agreement

Agreement ready for approval

Select the Ready for Approval check box

P.50.07

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_POH

Append_approval_document from MAR_CUSTOM.pll library

Email sent to the first user in the approval sequence

Approve agreement

Select Approved check box in approval sequence

P.50.07

A.20.49

AGREEMENT APPROVAL/REJECTION

ZP_EMT_PA

Email sent to buyer about agreement approval

Reject Agreement

Select Rejected check box in approval sequence

P.50.07

A.20.49

AGREEMENT APPROVAL/REJECTION

ZP_EMT_PR

Email sent to buyer to notify him about agreement rejection

Expediting

IRC is ready for approval

Select Ready for Approval check box

P.70.72 - IRCs tab

EXPEDITING

ZP_EMT_IRC

Email sent to expediter when IRC is ready for approval

IRC Approval by Traffic

Click Approve

Expediting

P.70.72 - IRCs tab

M_PCK_EXP_CUSTOM.NOTIFY_TC_AFTER_IRC_APPROVAL

ZP_IRCAPRQ = T

Email sent to project traffic coordinators when IRC is approved, to notify them that release notes can be created

Release note approval

Click Approve

Expediting

P.70.72 - Release Notes tab

M_PCK_EXP_CUSTOM.NOTIFY_SUPPLIER

M_PCK_EXP_CUSTOM.NOTIFY_TRAFFIC_CCORDINATOR

ZP_EML_SUP

ZP_EML_TC

Email sent to supplier and/or traffic coordinator when release note is approved

Reverse release note approval

Click Reverse Approval

Expediting

P.70.72 - Release Notes tab

M_PCK_EXP_CUSTOM.NOTIFY_SUPPLIER

M_PCK_EXP_CUSTOM.NOTIFY_TRAFFIC_CCORDINATOR

ZP_EML_SUP

ZP_EML_TC

Email sent to supplier and/or traffic coordinator when approval of release note is reversed

Shop expediter assigned

Enter name in Shop Expediter box

P.70.73 - Order Reference tab

All types

ZP_EMT_SE

Email notification sent to shop expediter

Shop inspector assigned

Enter name in Shop Inspector box

P.70.73 - Order Reference tab

All types

ZP_EMT_SI

Email notification sent to shop inspector

Vendor progress ready for approval

Select RfA check box

P.70.73 - Vendor Progress tab

EXPEDITING

ZP_EMT_VP

Email sent to expediter

Site

Approve MRR

Select RfA check box fills the approval sequence with the template assigned to project default ZC_MRRAPPR

C.20.01 Prepare MRR by PO

C.20.01.02 Prepare MRR by PO2

C.20.03 MRR by Direct Receive

C.20.04 Prepare MRR by Release Notes

C.20.05 Prepare MRR by Packages

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_MRR

ZC_MRRAPPR

Email sent to the first approver on the approval sequence

Approve MIR

Select RfA check box

C.20.21 MIR by Reservation

C.20.21.11 MIR for Plates

C.20.22.01 MIR by BOM Commodity

C.20.22.02 MIR by BOM Commodity (Group by)

C.20.22.04 MIR by BOM Ident

C.20.23.01 MIR by Direct Issue

C.20.23.02 MIR by Direct Issue (Group by)

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_MIR

ZC_MIRAPPR

Email sent to the first approver on the approval sequence

MIR expiration

The DBMS job ALR_MIR_EX must run to check the expiry dates of manual MIRs. An email will be sent to the creator of a MIR at ZC_ALR_EXP days before the actual expiry date.

C.20.23.01

ZC_ALR_EXP

An email notification is sent to the originator of the MIR on a specified day prior to the expiration date.

Forecast Shortage MRR Notification

Insertion of MRR line item

-or-

Post of MRR

C.30.01

Receiving screens

FORECAST SHORTAGE MRR NOTIFICATION

Forecast shortage MRR notification sent to distribution list

Ident Shortage Notification

DBMS Job

Automatically when onhand quantity falls below defined minimum onhand quantity

C.50.21

IDENT SHORTAGE NOTIFICATION

Ident/Warehouse shortage notification sent to distribution list

Approve SRR (Stores Requisition)

Select the RfA check box

C.60.02

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_SRR

An email is sent to the first approver in the approval sequence.

When the SRR is approved using the approval sequence, the approval email is additionally sent to the originator of the SRR.

A status email message is sent to the originator after all approvers on the approval sequence have approved the SRR. The status email message informs the originator that the SRR is now ready to post.

Subcontracts

Approve COR (Change Order Request)

Select the Ready for Approval check box

SM.40.02 > Authorization tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_COR

An email is sent to the first approver in the approval sequence.

Approve Schedule of Values

(Subcontract with payment type Schedule of Values)

SM.20.11 > Schedule of Values tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_SOV

An email is sent to the first approver in the approval sequence.

Approve SOV (Schedule of Values) Progress

(Subcontract with payment type Schedule of Values)

SM.20.11 > SOV Progress tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_PNO

An email is sent to the first approver in the approval sequence.

Approve Milestone Progress

(Subcontract with payment type Milestone Progress)

SM.20.11 > Milestone Progress tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_PNO

An email is sent to the first approver in the approval sequence.

Approve Item Progress

(Subcontract with payment type Measured Qty)

SM.20.11 > Item Progress tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_PNO

An email is sent to the first approver in the approval sequence.

Approve Invoice

Select the Ready for Approval check box

SM.20.11 > Invoices tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_INV

Approve CLOI (Closeout Item)

Select the Ready for Approval check box

SM.20.11 > Closeout Checklist tab

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_APPROVAL_CUSTOM.GET_INFORMATION_CLOI

An email is sent to the first approver in the approval sequence.

Issue Request for Information

Select Submit check box on SM.20.11

SM.20.11 > Request for Information tab
(accessed by the subcontractor from E-Supplier)

Request for Information

ZP_EMT_ISS

Notification sent to contractor when subcontractor issues RFI

Issue Request for Information

Select Issue RFI check box on SM.30.05

SM.30.05

Request for Information

ZP_EMT_ISS

Notification sent to subcontractor when contractor issues RFI

Submit answer on Request for Information

Select Submit Answer check box on SM.20.11

-or-

Select Issue Answer check box on SM.30.05

SM.20.11

Request for Information tab
SM.30.05

Request for Information

ZP_EMT_ANS

Notification sent to subcontractor when contractor issues answer

Punch list failed

Select Fail check box

SM.20.11

Punch Lists tab

Punch List Inspection Fail

ZP_EMT_PLF

Email sent when punch list inspection failed

Punch list is ready for inspection

Select Ready for Inspection check box

SM.20.11 > Punch Lists tab (accessed from supplier using E-Supplier)

Portal > Subcontracts > Punch Lists

Punch List Inspection Ready

ZP_EMT_PLI

Email sent when punch list is ready for inspection

Portal

Create new user

Portal > My Account > Users

M_PCK_COMPANY_CUSTOM.NEW_USER_TEXT

M_PCK_COMPANY_CUSTOM.NEW_USER_TEXT2

Email is sent to Portal user with the username

Email is sent to Portal user with the (encrypted) password

Change user password

Portal > My Account > Users

M_PCK_COMPANY_CUSTOM.GET_MAIL_FOR_CHANGED_PWD

Email is sent to Portal user with the new password. Password is encrypted if Force Change Password is not selected

Click Forgot your password

Portal Login > Forgot your password?

M_PCK_COMPANY_CUSTOM.GET_MAIL_FOR_CHANGED_PWD

Email is sent to Portal user with the auto-generated password, which has to be changed on first login

Invite Suppliers who are registered in Smart Materials but not in the Portal, to login and complete their data in the Portal.

Click Portal Access.

P.20.01 > Portal Access button

Companies > Portal Access button

M_PCK_COMPANY_CUSTOM.SUP_OT_ACCESS_EMAIL_TEXT

Email is sent to the supplier with Portal URL, username and one-time password

Submit Registration RFI or question to the supplier.

Click Send on Companies > Requests for Information.

Companies > Requests for Information

M_PCK_COMPANY_CUSTOM.LOGIN_REQ_RFI_EMAIL

Email sent to the supplier

Submit answer on Registration RFI question to the contractor.

Click Send on the Request for Information page in the Portal.

Portal > Request for Information

M_PCK_COMPANY_CUSTOM.RFI_EMAIL_TO_BUYER

Email sent to the buyer

Submit login request

Click Submit, enter the captcha, and click I agree.

Portal > Summary

DBA Setting LOGIN_REQUEST_APT

Email is sent to the first approver on the approval sequence

Approve login request

P.20.02

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_COMPANY_CUSTOM.COMPANY_APPROVAL_EMAIL_TEXT

Email sent to the supplier for the approval of the Portal (E-Supplier) login request

Approve company profile

P.20.04

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_SUBJECT

M_PCK_APPROVAL_CUSTOM.BUILD_APPROVAL_BODY

-> M_PCK_COMPANY_CUSTOM.CP_PROFILE_APPROVAL_TEXT

Email sent to the supplier for the approval of the company profile

Approve Supplier

P.20.01

M_PCK_COMPANY_CUSTOM.GET_MAIL_FOR_APPROVED_SUPPLIER

Email sent to the supplier to inform about the approval

Change company data after approval

Portal >My Account > Company

M_PCK_COMPANY_CUSTOM.GET_MAIL_FOR_CHANGED_COMPANY

Email sent to approvers (user assigned to approval sequence) to notify about the company data changes

DBMS Job CMGR_RMNDR

A.60.45

Portal > My Account > Materials and Services

M_PCK_COMPANY_CUSTOM.SEND_REMINDER_CMNGR_MAIL

Emails are sent to inform the involved commodity managers about materials and services assigned to suppliers (on My Materials and Services in the Portal) which are not yet verified for approval. Emails are sent until the status is set to Approved or Rejected

DBMS Job CMGR_RMNDR

A.60.45

P.20.01> Material/Work Groups

M_PCK_COMPANY_CUSTOM.SEND_SUP_MATGR_REMINDER_MAIL

Email is sent to inform involved suppliers about material group status change. At the same time, the Supplier Informed date is set in P.20.01

Material or Service approved or rejected by a commodity manager on P.20.01 > Material/Work Groups

P.20.01 > Material/Work Groups

M_PCK_COMPANY_CUSTOM.APPROVAL_MG_INVITATION_TEXT

Email is sent to inform involved commodity managers about approval of a material or service that is assigned to a supplier

Supplier removes a material or service from My Materials and Services in the Portal

Portal>My Account > Materials and Services

M_PCK_COMPANY_CUSTOM.UNSUPPORTED_MG_MAIL

Email is sent to the commodity managers to notify about the withdrawal of a material or service by a supplier

Submit answer on Request for Information for inquiry

Select Submit Answer check box on P.30.27

-or-

Click Send on the Request for Information tab in the Portal

Portal

or P.30.27
(E-Supplier)

Request for Information

ZP_EMT_RA

Notification sent to the buyer (m_inquiries.po_buyer) when subcontractor submits an answer on RFI for inquiry.

In case of a technical RFI further emails are sent to:

Originator of the requisition (m_reqs.originator), Approver of the requisition (m_reqs.approved_by), Person who released the requisition to procurement by clicking the Release button on R.30.01 (m_reqs.rel_to_proc_by)

Submit question on Request for Information for inquiry

Select Submit Question check box on P.30.22 or P.30.23

Portal

P.30.22

P.30.23

Request for Information

ZP_EMT_RQ

Notification sent to subcontractor or buyer when an RFI (for inquiry) question is saved.

Additionally, an email is sent to the buyer assigned to the inquiry (m_inquiries.po_buyer).

In case of a technical RFI further emails are sent to:

Originator of the requisition (m_reqs.originator), Approver of the requisition (m_reqs.approved_by), Person who released the requisition to procurement by clicking the Release button on R.30.01 (m_reqs.rel_to_proc_by)

Finalize quote

Click Finalize Quote button in E-Supplier or Portal

Portal

or P.30.27
(E-Supplier)

All types

ZP_EMT_FQ

Email sent to quote desk (buyer) when bidder finalizes quote

Bidder does not intend to bid on inquiry

Click No Bid button

E-Supplier Login

All types

ZP_EMT_NB

No Bid email sent to buyer

Supplier adds, deletes, or modifies an attachment or shipping invoice after submitting a release note

Portal--> Packing

SHIN_CHANGED

None

Notification email is sent to the traffic coordinator and the supplier

Supplier submits a release note for approval.

Portal--> Packing

RELN_SUBMITTED

None

Notification email is sent to the traffic coordinator and the supplier

Supplier submits/resubmits a PPL

Portal--> Packing

PPL_SUBMITTED

None

Notification email is sent to the traffic coordinator and the supplier

Supplier modifies the VDR documents for a PPL/release note after submitting the PPL or release note.

Portal--> Packing

PPL_VDR_DOCUMENTS_CHANGED / RELN_VDR_DOCUMENTS_CHANGED

None

Notification email is sent to the traffic coordinator and the supplier

Freight Forwarder adds a damage incident for a shipment.

Portal--> Freight Forwarding

SHIPMENT_DAMAGED

None

Notification email is sent to the traffic coordinator and the Freight Forwarder

Freight Forwarder submits an invoice attachment.

Portal--> Freight Forwarding

IAT_SUBMITTED

None

Notification email is sent to the traffic coordinator and the Freight Forwarder

Freight forwarder initiates a new conversation with traffic coordinator (for a shipment/invoice attachment/monthly invoice).

Click Chat with Traffic Coordinator.

Portal--> Freight Forwarding

SHIPMENT_CONVERSATION / IAT_CONVERSATION / MINV_CONVERSATION

Email notification is sent to the traffic coordinator and the freight forwarder.

Freight Forwarder submits a monthly invoice.

Portal--> Freight Forwarding

MINV_SUBMITTED

None

Notification email is sent to the traffic coordinator and the Freight Forwarder

Traffic

Traffic coordinator invites the supplier for packing.

Click Invite Supplier.

Traffic

Agreement details

POH_INVITED_FOR_PACKING

Email notification is sent to the supplier and the traffic coordinator

Traffic coordinator approves a packing list

Click Approve

Traffic

Packing list details

RELN_APPROVED

Approval email is sent to the supplier and the traffic coordinator

An email is also sent to the freight forwarder about packing list availability.

Traffic coordinator reverses the approval of a packing list.

Click Reverse Approval

Traffic

Packing list details

RELN_APPROVAL_REVERSED

Email notification is sent to the supplier, freight forwarder, and traffic coordinator.

Traffic coordinator acknowledges the documents in a packing list

Click Acknowledge Documents

Traffic

Packing list details

RELN_ACKNOWLEDGED

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator reverses acknowledgment of documents in a packing list

Click Reverse Acknowledgement

Traffic

Packing list details

RELN_ACKNOWLEDGEMENT_REVERSED

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator releases a packing list to freight forwarder

Click Release to Freight Forwarder

Traffic

Packing list details

RELN_RELEASED_TO_SHIPMENT

Email notification is sent to the freight forwarder to start the shipment process and traffic coordinator

Traffic coordinator reverses the release to freight forwarder

Click Reverse Release to Forwarder

Traffic

Packing list details

RELN_RELEASE_TO_SHIPMENT_REVERSED

Email notification is sent to the freight forwarder and traffic coordinator

Traffic coordinator rejects a release note.

Click Reject

Traffic

Packing list details

RELN_REJECTED

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator sends a comment to the supplier

Click Send Comments.

Traffic

Agreement details

POH_COMMENTS_SENT

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator gives ownership of a release note or PPL to the supplier.

Select Ownership to Supplier option.

Traffic

Change PL/PPL Ownership

RELN_OWNERSHIP_GIVEN/PPL_OWNERSHIP_GIVEN

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator takes away ownership of a release note or PPL from the supplier.

Clear Ownership to Supplier option

Traffic

Change PL/PPL Ownership

RELN_OWNERSHIP_TAKEN/PPL_OWNERSHIP_TAKEN

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator confirms the fulfillment of an agreement.

Click Confirm Fulfillment.

Traffic

Agreement Details

POH_FULFILLED

Email notification is sent to the supplier and traffic coordinator

Traffic coordinator approves an invoice attachment or monthly invoice.

Click Approve.

Traffic

Invoice Attachment /Monthly Invoice Details.

IAT_APPROVED/MINV_APPROVED

Email notification is sent to the freight forwarder and traffic coordinator

Traffic coordinator rejects an invoice attachment or monthly invoice.

Click Reject.

Traffic

Invoice Attachment /Monthly Invoice Details.

IAT_REJECTED/MINV_REJECTED

Email notification is sent to the freight forwarder and traffic coordinator

Traffic coordinator initiates a new conversation (for a shipment / invoice attachment / monthly invoice) with freight forwarder.

Click Chat with Freight Forwarder.

Traffic

SHIPMENT_CONVERSATION / IAT_CONVERSATION / MINV_CONVERSATION

Email notification is sent to the freight forwarder and traffic coordinator