This project default is used for material receiving. It sets the scrap warehouse for the project. If the scrap warehouse is in use, the project default is not updateable.
The scrap warehouse is used for site inspection. On C.50.11 Site Inspection, idents that failed the site inspection are moved into the scrap warehouse.
-
Module(s) affected by this setting: C2001, C200102, C2003, C2004, C2005, C2007, C5011
-
Default value: ./.
-
List of Values: Warehouses defined on C.10.02 Warehouses with scrap_ind=Y