ZC_AOS_DAT - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.1

This project default controls if the AOS (Actual on Site) date in Expediting is set on posting the MRR or on entering the receiving date.

If ZC_AOS_DAT is set to Y, the AOS date is set on entering the receiving date. If ZC_AOS_DAT is set to N (this is the default), the AOS date is set when the MRR is posted.

  • Module(s) affected by this setting: C2001, C200102, C2004, C2005, C2007

  • Default value: N

  • List of Values: N/Y