ZP_REQNODE - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.1

Requisition node for switching order type of manual POs and for manually added positions.

This project default must be set if you want to switch the order type of manually created orders in screen P.50.07 (button Switch Order Type) or if you want to approve an order with positions that have been added manually (without referencing any quote or requisition).

You must select a requisition node for this project default. It is required because the expediting module is based on requisitions. When switching the order type or approving the order, a requisition with corresponding line items is automatically created in the background. Otherwise, these orders or order line items would not be visible in expediting and consequently cannot be tracked.

The requisition node entered here is disabled for engineering. Neither templates nor requisitions can be created for this node by engineering.

  • Module(s) affected by this setting: P5007, P7071, P7073

  • Default value: ./.

  • List of Values: R1041 Req Nodes and Templates