Extend Existing Scheduling - Intergraph Smart Instrumentation - Help

Intergraph Smart Instrumentation Help

Language
English
Product
Intergraph Smart Instrumentation
Search by Category
Help
Smart Instrumentation Version
13.1
  1. Start the Maintenance module.

  2. In the Maintenance Activities Summary window, filter the records as needed.

  3. Highlight the required row in the Preventive Maintenance data window and select Actions > Extend Extend Schedule icon 16bit.

  4. On the Extend Scheduling dialog, do the following:

    1. On the Take scheduling data from group box, select one of the following:

      • Last preventive maintenance activity — fetch the scheduling data from the last PM activity.

      • Preventive maintenance code defaults — fetch the scheduling data from the PM codes.

    2. On the Limit scheduling by group box, select one of the following:

      • Date — Sets the scheduling limited by date. Use the spinner to set the required date.

      • Number of activities — Sets the scheduling limited by the number of activities. Enter the number of activities in the field provided.

  5. Select Generate.

  6. Select Close after the record generation is complete.