The following features are out of scope in the current release:
-
The software does not perform validation of item tag sequence uniqueness in the off-site plant. Instead, it is the responsibility of the Host Administrator to supply suitable sequence ranges to the Off-Site Plant Administrator.
-
When saving a project for reloading into a plant or saving a plant for merging in the host, Smart Engineering Manager copies to the host or off-site plant all new reference schema items of the following types only:
-
Reference cables
-
Typical blocks
-
Typical schematics
-
Cableway components
Existing reference schema items and other types of reference schema items remain unchanged.
-