Load the materials system administrative file - Intergraph Smart Construction - Hotfix 10 - Installation & Upgrade - Hexagon

Intergraph Smart Construction Installation and Upgrade

Language
English
Product
Intergraph Smart Construction
Search by Category
Installation & Upgrade
Smart Construction Version
8

Use the SmartPlant Foundation Loader to load an administrative file that is required to add the materials system mapping template to SmartPlant Foundation.

  1. Log on to SmartPlant Foundation Desktop Client as an administrator.

  2. Click File > Loader to open the Loader dialog box.

Browse to the administrative files in the LoadFiles folder in the Smart Construction installation location. For example, navigate to [Drive]:\Program Files\SmartConstruction\LoadFiles\Current.

  1. Navigate to the 005-ConfigDocuments folder.

  2. Select the 08-ConfigDoc_MaterialMappings.xml file.

  3. Click Process. Results of the load display in the Processed load files list.

  4. Click Load Results to view load process details.