The Engineering change notification occurs on a per IWP basis, so all drawings in an IWP that have revisions to must be acknowledged in order to clear the notification on the IWP.
For more information, see Acknowledge an engineering change.
The Engineering change notification occurs on a per IWP basis, so all drawings in an IWP that have revisions to must be acknowledged in order to clear the notification on the IWP.
For more information, see Acknowledge an engineering change.