Filter IWPs by date - Intergraph Smart Construction - 2019 (7.0) - Help - Hexagon PPM

Intergraph Smart Construction Help (2019)

Language
English
Product
Intergraph Smart Construction
Search by Category
Help
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10
  1. Click Filter by Date to open the Date Filters on the Work Packages window or browser.

  2. Click a Date Filter to filter the IWPs by date.

  3. Drag the left part of the slider to set a Start Date.

  4. Drag the right part of the slider to set a Stop Date.

  5. Drag the Date Range Bar to view different dates.

  • The default date range displays the next twenty-one days.

  • When you filter by dates, the window shows which IWPs are planned to start during the date range that is set.

See Also

Create and manage work packages