The following reports are delivered in Smart Construction. Some reports may be delivered, but not enabled.

Each Smart Construction report is delivered as an individual load file, located in the 090-Reports folder in the installation location (for example, browse to [Drive]\Program Files (x86)\SmartConstruction\2019\LoadFiles\003-Admin\090-Reports). You can load each report individually, or you can select all reports to load.

Report Name

Enabled by Default?

Scope

Description

CWP Schedule Breakdown

Yes

Project wide

Displays all IWPs and their dates planned for a CWP. The report also displays all dates related to a CWP

CWP Summary

Yes

Individual CWPs

Displays a summary of a CWP, including a forecasted, planned, and completed man hours.

Material Request Form

No

Individual IWPs

Displays material request items for an IWP. Use the SPC_MaterialView access group to enable this report.

Planned vs. Actual Man Hours

Yes

Project wide

Displays IWP actual and planned man hours grouped by discipline and purpose.

Progress Summary by CWP

Yes

Project wide

Displays the progress of your construction project, broken down by contractor and CWP. You can use selection criteria on the Report Options dialog box to filter and display specific information.

Progress Summary by IWP

Yes

Project wide

Displays the progress of your construction project, broken down by contractor, CWP, and IWP. You can use selection criteria on the Report Options dialog box to filter and display specific information.

Scorecard

Yes

Individual IWPs

Displays the components associated with an IWP. Best viewed as an 11" X 17" document.

IWP Summary

Yes

Individual IWPs

Displays the contents of an IWP. Best viewed as an 11" X 17" document.

IWP Progress Details

Yes

Individual IWPs

Displays progress for individual components in an IWP.

Work Scope by Discipline

Yes

Project wide

Displays the progress of the work scope, broken down by discipline. The progress of each discipline is listed as a percentage of the total work scope.