Fixes - Intergraph Smart Completions - Intergraph Smart Completions Update 5 - Release Notes

Intergraph Smart Completions Release Notes

ft:locale
en-US
Product
Intergraph Smart Completions
Search by Category
Release Notes
Smart Completions Version
6.0.5
  • 2993140 Duplicate Revisions in Documents Occurring if Workflow is not Refreshed

  • 4409289 Add Protections Against Duplicating RFI Tags

  • 4478047 Punch Creation From Step in Certificate Form Does Not Always Assign System or Subsystem / Area or Location

  • 4508056 Record Test Equipment Step - Duplicate Test Equipment Showing in Drop-Down

  • 4571620 Update Messaging - Work Package Calculate Button Result Returns "Undefined"

  • 4590266 NEW UX- Theme- Edit Right to vResources Required to Save Default Dark Theme

  • 4593149 New UX: 'Verifying User Limiters' message appears while batch checking-out records

  • 4593891 Able to batch edit punchlist without adding certain mandatory fields

  • 4598461 Smart Cloud Only - New User Notifications from Resources Manager Not Reflecting Full Username

  • 4603458 Block Execution of Other Task Types from Task Completion

  • 4603504 Add protection to block changes in workflow settings when closed records exist

  • 4603552 User with "Edit List" right can edit punchlist at locked state

  • 4605846 New UX - White Space Prohibits System/Location/WBS Trees from Expanding

  • 4607036 New UX - Notification Center: User logs out after clicking task hyperlink

  • 4607889 Skyline - Pending Punchlist Tab Shows Completed/Closed PLs From Before Custody is Added

  • 4613406 Assignments not importing in vCertificates Import Type

  • 4625894 New UX: Export from Reports Tab is not following column selection

  • 4636462 Issues with Project Specific Saved Exports When User in All Projects

  • 4645593 Certificate: Selected User Not Saved in 'Email Notification' Dropdown

  • 4648605 New UX - Selection Retained When Selecting Rows Across Different Pages

  • 4658105 Task Models Are Renamed Before Clicking the FINISH Option

  • 4678324 New UX - Isolation Issues

  • 4681751 Cable Drums - Installed Length Field Added in Cable Asset is Not Populating in Cable Drum

  • 4684141 Inconsistency observed while downloading TOP Package

  • 4738298 PDF Forms Failing to Render with Form button

  • 4722487 PDF Forms Failing to Render with Sign-Off Using Newly Created E-Signatures

  • 4728135 Certificate Status Changes to “Created” After Upgrade

  • 4731119 Creating Tasks by Systemization - Systemization Structures Being Pulled from Other Instances/Projects

  • 4727237 Add Warning/Protection - Deleting Document Forms Removes Paper Completed PDF from Child Tasks

  • 4754876 New UX Task Manager - Primary Panel - Records not Loading/Grid Freezes When Scrolling

  • 4758133 New UX - Dashboard Filter - Data Does Not Populate in DropDowns

  • 4754625 New UX: Closed Certificate - File Upload Discrepancies Between New UX and Classic UI

  • 4761674 New Ux -Beta feedback -Field log and documents tab showing incorrect records

  • 4758153 Flange Joint task paper Forms - Many Template Fields do Not Work & Cannot Render FJ Merge Forms from Planned task Module

    SHARED Tip When you perform a mail merge with asset fields for a flange joint task, it is recommended to perform the mail merge from the planned tasks manager only. For more information, see Insert Mail Merge Fields into a Form.