Work Packages - Intergraph Smart Completions - Intergraph Smart Completions Update 17 - Help - Hexagon

Intergraph Smart Completions Help (5.3.17)

Language
English
Product
Intergraph Smart Completions
Search by Category
Help
Smart Completions Version
5.3.17

The Work Packages Manager is designed to manage the development, scheduling and execution of Project completion. Work Packages compile all tasks, their associated documents, punch lists, and other data for assets/loops/packs. These associated loops and loop tasks are displayed under work steps tab in secondary panel.They can be compiled ad hoc, or determined by systemization or physical location.

Work steps comprise each item of work to be completed in a work package. They can be task-centric or volume-centric. Volume-centric steps are measurements that are not associated with an already created task. For example, if the step simply requires the field user to document the amount of concrete that has been poured, then a task model is not required. A configuration in the Work Step Type Manager will be used instead. Volume-centric steps are hard-coded and must be imported into the system. See Work Step Volume Types r for more information on mapping and importing.

Configuring Work Steps for volume-centric steps can be complex and will require in-depth training. Please contact your designated support representative to discuss your project and needs.

A Task step links an existing Task as a step in the Work Package. To create these, you must create a Task Model and a Task within the system. This work package can either be compiled into a paper package to complete in the field, or the tasks can be completed digitally on the iOS application.

A work package includes:

  • WP ID, Work Description, Category

  • Steps, which can be Volume-Centric or Task-Centric

  • Punchlists

  • Tasks / Checklist

  • Tools / Materials

  • Loops and Packs

  • Workgroup and Resources

  • Documents

  • Work Package Smart Form

1.Work Package Main

While importing if you have to add manual tags to Job cards, Work packages, and Contracts, you need to add a column named auto tag with value as 0 in the import file. The Tag ID should consist at least 5 alphanumeric characters. To automate the generation of an Tag ID, the value should be either empty or an alphanumeric value with less than 5 characters.