Fourth, test the configuration after all configuration has been saved. To test the configuration, it is important to test the connector by selecting “fetch data”, which will load the document list into the ISC document module.
Fourth, test the configuration after all configuration has been saved. To test the configuration, it is important to test the connector by selecting “fetch data”, which will load the document list into the ISC document module.