An equipment foundation makes the installation of equipment easier. The foundation is typically connected to the floor, deck, or wall, and the equipment is then bolted to the foundation. You can place the equipment foundation either before or after you place the equipment in the model.
Objects in an as-built model, called Smart Interop Objects, contain common schema property values that associate model objects to physical objects.