All Cases A, B, C, and D
-
For Global Workshare configurations, upgrade from 13.1 to 14 Update 1 requires a consolidation of databases. The upgrade process is performed from the Host location after consolidation of the databases.
-
At the Host location, use the 13.1 client workstation that has the Project Management component installed to consolidate the Smart 3D configuration.
-
After consolidation, check that all permission groups belong to the Host location.
-
-
For assistance with these steps, refer to Consolidate Model from Workshare Command in Global Workshare Oracle or Global Workshare SQL Server.