Post Upgrade Activities - Intergraph Smart 3D - Installation & Upgrade

Intergraph Smart 3D Upgrading from 13 to 14 Update 1

Language
English
Product
Intergraph Smart 3D
Subproduct
Upgrade Guide
Search by Category
Installation & Upgrade
Smart 3D Version
13
  1. Global Workshare Configuration can be re-initiated at this time. For steps to upgrade Smart 3D configurations in a Global Workshare environment with the 14 Update 1 release, see Consolidate the Global Workshare Configuration.

  2. After upgrade of Smart 3D standard models where previously generated SIO objects are being prepared for share to HxGN SDx, it is highly recommended to process all existing SIO data using the new repair commands delivered in S3D 14 Update 1. Prepare Smart 3D Handover model data for Project As-Built.

    There are many enhancements available for ISIP 17 translations and S3D 14 Update 1 SIO generation. Therefore, it is recommended to re-translate source files using ISIP 17 and regenerate SIO data again in S3D 14 Update 1 for optimal functionality. This should be done only if there was not a significant amount of post-processing done on already existing data.

  3. Review each Appendix and determine if further actions need to be completed.

    All of the Appendixes are optional and are not required to proceed with production activities.