Prepare the Workstation for the Upgrade - Intergraph Smart 3D - Installation & Upgrade

Intergraph Smart 3D Upgrading from 13 to 14 Update 1

Language
English
Product
Intergraph Smart 3D
Subproduct
Upgrade Guide
Search by Category
Installation & Upgrade
Smart 3D Version
13

All Cases A, B, C, and D

Installing the 14 Update 1 Smart 3D client software requires all previous Smart 3D installations to be uninstalled.

  1. Install the required Enterprise Platform software on the client, if changes are required. For assistance installing the required workstation Enterprise Platform software, refer to Intergraph Smart 3D Installation.

  2. Install the 14 Update 1 Smart 3D client software, including the latest 14 Update 1 Hot Fixes when available, on the client workstation where you will perform the upgrade process.

  3. If you are in an integrated environment, install version 10.0 of both SmartPlant Schema Component and SmartPlant Client. For assistance installing, refer either to the 3D Project As-Built Installation and Setup for HxGN SDx or SmartPlant Foundation Desktop Client Workstation Setup.