Pipe run to pipe run connections - Intergraph Smart 3D - Help

Intergraph Smart 3D Piping

Language
English
Product
Intergraph Smart 3D
Subproduct
Piping
Search by Category
Help
Smart 3D Version
12.1 (2019)
SmartPlant Foundation / SDx Version
10

No.

Route Object

Approval Status

Permission Group Access

1

Pipe run A

Working

Full control/ Write

2

Pipe run B

Non-working

Full control/ Write

3

Free leg A

Working

Read-only

4

Free leg B

Non-working

Full control/ Write

5

Pipe runs connected via base flanges

Result: The software disconnects pipe runs. Base flanges are not deleted. The free leg A stays with the pipe run A. The approved free leg B is disconnected from the pipe run A, and a To Do Record is generated for the flange connection and branch connection.

You must have Write access on the pipe run B flange and the free leg B to update the To Do Records.

No.

Route Object

Approval Status

Permission Group Access

1

Pipe run A

Working

Full control/ Write

2

Pipe run B

Working

Read-only

3

Mating flange associated with pipe run B

4

Mating reducer associated with pipe run B

Result: The software disconnects pipe runs and deletes all associated connections. Mating flanges and the mating reducer are deleted. Both the pipe runs become discontinuous.

No.

Route Object

Approval Status

Permission Group Access

1

Pipe run A

Non-working

Full control/ Write

2

Pipe run B

Working

Full control/ Write

3

Mating reducer associated with pipe run A

Result: The software disconnects pipe runs, and deletes all associated connections. The mating reducer is not deleted, as it is in non-working status. Both the pipe runs become discontinuous. You must update the To Do Record on the reducer to delete the mating part.

To update the To Do Record, you must have Write access on the part.