Create a drawing using WBS objects - Intergraph Smart 3D - Help - Hexagon

Intergraph Smart 3D Orthographic Drawings

Language
English
Product
Intergraph Smart 3D
Subproduct
Drawings and Reports
Search by Category
Help
Smart 3D Version
13

Work Breakdown Structure (WBS) Projects manage the composition of the plant based on the construction work to be completed. For example, new and existing objects in the model can be symbolized differently by assigning them to a WBS Project. Drawing view styles can also be configured to symbolize the difference between new and existing projects.

The following procedure shows how to create a drawing that includes WBS Project objects.

Assign Objects to WBS Project

Objects must be included in a WBS Project before they can symbolize correctly in a drawing. See Project Menu in the Smart 3D Common Help for information on using WBS Project.

Create a Parameterized/Asking Filter

A parameterized, or asking, filter must be created before configuring a custom view style for the drawing. See Create a new asking filter in the Smart 3D Common Help.

When creating the filter, include the appropriate WBS Project(s) in the Work Breakdown Structure Tab of the Filter Properties Dialog.

Create a View Style for WBS Objects

You must create a custom view style that includes the parameterized filter created in the previous step. See Create an Orthographic Drawing View Style in the Smart 3D Drawings and Reports Reference Data.

Select WBS Project on Drawing Properties and Update

  1. Right-click a drawing in the Drawing Console or Drawing and Reports task, and select Properties to open the Drawing Properties dialog.

  2. Select the Style Tab (Properties Dialog).

  3. In the WBS Project row, change the Value to the appropriate WBS Project. You can also change the Behavior to Inherit, Override, or Force Override. The default behavior is set to Inherit.

  4. Click OK and update the drawing(s).

If a property in the WBS Project field is changed, the entire drawing is marked out-of-date in order to resymbolize the appropriate WBS items when an update is performed.

See Also

Edit a composed drawing